From container to commissioning.
One accountable supplier from purchase order to first legal weighing.
QuotationConfiguration sheet sized from your axle loads, throughput and legal requirements.
ProductionWelding, blasting Sa2.5, coating and fatigue-grade QC inside the Yantai plant.
Shipping60-day worldwide lead time; EXW, FCA, FOB, CNF, CIF, DAP or DDP.
CommissioningRemote guidance or on-site crews for deck alignment, sensor calibration and software setup.
After handover
- Spare load cells, indicators and cables stocked for our own models
- Remote diagnostics on instrument and platform software
- Re-verification support when local metrology authority inspects
Questions before ordering?
Ask about your country's verification rules; we adapt the paperwork.